Javys, a.s.

System implementation: integrated computer system for nuclear power plant V1, decommissioning logistics system

  • System analysis, blueprint preparation
  • Customizing, testing, user documentation preparation
  • Module testing: preparation, training
  • Go-live support in production system
  • Customer solution (Add-on in SAP R/3) for the complete process of phasing-out of the nuclear power plant V1
  • Standard logistics processes are used and ellaborated from the modules MM, QM and WM
  • Complete process of phasing-out has following subprocesses:

                o   Preparation for dismantling
                o   De-contamination before disassembling and dosimetric measurements
                o   Dismantling
                o   Logic Unit (customer unit for waste observation at every time and in every form) with own chip card – creation, filling, assignment to a real container
                o   Radiological measurements and recording of measured values
                o   Transfer between warehouses / expedition / final processing
                o   Complex calculation of radiologic values / chemical elements etc.